Advanced Experimental Design case study released

8 Jan 2024
The Boyne Smelters Limited plant. Copyright © 2023 Rio Tinto

JKTech has released a new case study focusing on a collaborative project undertaken with  Boyne Smelters Limited (BSL) that identified strategies to improve the performance of their dry, fixed-speed autogenous (AG) mill.

BSL has been operating since 1982 and is Australia’s second-largest aluminium smelter. The operation is located in Central Queensland and activities include manufacturing carbon anodes in the carbon plant, aluminium production (smelting) in reduction lines, and casting of molten metal into aluminium products ready to ship. 

 

Read the case study

 

 

Latest